Foundational development partner sought immediately

Australian modular data centre development opportunity

25 MW to start. Target first power in 12 months from FID. Expansion pathway to 400 MW.

SiliconAurora invites modular data centre developers, manufacturers and manufacturing-led consortia to jointly develop an initial 25 MW campus at Aurora Energy Precinct, 25 km north of Port Augusta, South Australia. We offer a local development platform, long-term land tenure, dedicated energy development and the opportunity to grow together. Australian fabrication, assembly, commissioning and servicing are particularly welcome.

Plenty of sun. Plenty of space. No need to build it in someone's backyard.

25 MW100 MW400 MW AURORA ENERGY PRECINCTPort Augusta, South Australia
Aurora Energy Precinct, South Australia: site photograph
Aurora Energy Precinct, South Australia: site photograph

01

The opportunity

Aurora Energy Precinct, South Australia: site photograph
Aurora Energy Precinct, South Australia: site photograph

A greenfield, approximately 1,580-hectare (3,904-acre) energy precinct on a former sheep station under a 40-year Crown lease (original term). Stage 1 targets 25 MW of total facility power and first power within 12 months of final investment decision (FID), using dedicated on-site generation rather than initially relying on a major new grid connection. Proposed generation redundancy: N+2; availability design objective: 24/7/365. Subsequent development targets 100 MW and 400 MW. Net IT capacity, data centre completion date, PUE, cooling and rack density will be agreed with the partner.

1,580 hectares. You could lose a footy out here and still have room for the car park.

02

Power and pricing

Aurora Energy Precinct, South Australia: site photograph
Aurora Energy Precinct, South Australia: site photograph

Initial

Firm facility power target

25 MW

Indicative electricity price

A$250/MWh (US$170/MWh)

Expansion

Firm facility power target

100 MW

Indicative electricity price

A$150/MWh (US$100/MWh)

Large-scale campus

Firm facility power target

400 MW

Indicative electricity price

A$100/MWh (US$70/MWh)

All capacities, prices and timeframes are indicative targets, subject to engineering, approvals, financing and definitive agreements. US$ figures use an illustrative AUD/USD rate of 0.663.

Target AUD price reduction: 60%. Potential capacity expansion: 16 times. Negotiate priority expansion rights and contractual access to price reductions. Initial hybrid/off-grid generation is intended to bridge later renewable, storage and grid integration; renewable fraction and PPA inclusions, duration and indexation remain to be established.

03

Site and infrastructure

Aurora Energy Precinct, South Australia: site photograph
Aurora Energy Precinct, South Australia: site photograph
  1. 01

    70 MW solar PV and 140 MW / 280 MWh battery storage development approved; 300 MW intermediate solar expansion potential and approximately 2 GW total precinct solar potential (not firm data centre power).

  2. 02

    Adjacent 275 kV transmission and 33 kV distribution infrastructure; indicative line capacity reported as 100+ MW and 2+ MW respectively, subject to connection studies and agreements. Potential Northern Transmission Project integration.

  3. 03

    On-site and adjacent triple fibre infrastructure; ElectraNet OPGW east and transcontinental fibre west. Indicative service capacity up to 400 Gbps to supported endpoints; potential optical capacity above 50 Tbps per fibre pair, subject to engineering. Carrier availability, latency and physical route independence require confirmation.

  4. 04

    Adjacent water pipeline with stated capacity of 6 kL/hour; potential Northern Water Project access. Water entitlement and reliable allocation are not yet established in this offer.

04

Foundational development partnership

Jointly plan, design, finance, construct and commercialise the 25 MW campus. Propose repeatable modular architecture, high-density direct-to-chip liquid cooling, integrated power and controls, factory capacity, delivery schedule, Australian compliance, installation, service and maintenance. Support customer acquisition and consider equity, leasing or vendor finance. International manufacture, Australian manufacture and hybrid assembly are welcome. No proprietary architecture has been mandated.

Illustrative configurations: 10 × 2.5 MW, 5 × 5 MW or 2 × 12.5 MW facility modules at 25 MW; at 400 MW these would equate to 160, 80 or 32 modules respectively. Not orders or purchase commitments.

Modular and repeatable. Like a good pub parma: same thing every time, and nobody complains.

05

Other commercial opportunities

01

Manufacturers and suppliers

complete modules, data halls, electrical systems, cooling, controls and integrated compute equipment; potential repeat orders and Australian reference project.

02

Developers and offtakers

powered land, powered shells, turnkey facilities or dedicated on-site power under negotiated agreements; off-site new-build renewable PPAs for NEM portfolios, subject to grid access and settlement (not physical firm supply at distant sites).

03

Investors

project-level equity, development JV, land and shared infrastructure, energy asset or data centre ownership; compute assets may be separately owned. Returns and investment terms are not yet specified.

06

Community collaboration and engagement

Traditional Owners and landholders

Barngarla Determination Aboriginal Corporation

SiliconAurora has an agreed compensation agreement with the local Traditional Owners, the Barngarla Determination Aboriginal Corporation.

Visit barngarla.org.au

Pastoral family

SiliconAurora also has a compensation agreement with the pastoral farming family who have farmed sheep on the property for generations.

Spencer Gulf Power & Data Co-operative

SiliconAurora proposes a community benefit programme through the Spencer Gulf Power & Data Co-operative (SG Power), seeking lower local electricity bills and greater energy resilience for communities around the precinct.

SG Power is a concept-stage initiative in South Australia proposing that communities near major renewable energy and AI data centre projects share directly in their benefits. It is not yet incorporated and is not an authorised electricity retailer.

  1. 01

    Lower electricity bills

    Competitive offers and recurring bill credits, funded partly by participating developers.

  2. 02

    Proximity-to-generation credits

    For customers living closest to participating projects.

  3. 03

    Local energy resilience

    Exploring backup power, batteries and microgrids for essential services.

SG Power is at concept stage and is inviting public comment. Its proposals are not confirmed commitments by SG Power, its founders or any developer, and SiliconAurora’s participation remains a proposal.

Visit spencergulfpower.com.au

07

Contact us

Provide organisation, country, corporate email, partner type, proposed capacity, deployment schedule, manufacturing capability, financing appetite and technical requirements. Request a management meeting or confidential project information. Prospective partners from all markets are welcome.

Shane reads every email himself. Usually before smoko.

Contact us
Aurora Energy Precinct, South Australia: site photograph
Aurora Energy Precinct, South Australia: site photograph