Initial
Firm facility power target
25 MW
Indicative electricity price
US$170/MWh (A$250/MWh)
Seeking a founding development partner now
Start at 25 MW. Target first power 12 months after FID. Scale toward 400 MW.
Bring your modular AI infrastructure platform to Australia. SiliconAurora invites data center developers, OEMs and manufacturing-led consortia to jointly develop an initial 25 MW campus, 25 km (about 16 miles) north of Port Augusta, South Australia. Establish a reference deployment, pursue repeat installations and negotiate a long-term development and supply relationship.
That's not a development site. Now THAT'S a development site. With 3,904 acres across the energy precinct, there is room to plan for the next deployment.
01

Approximately 3,904 acres (1,580 hectares) under a Crown lease with an original 40-year term, on a former sheep station. The initial 25 MW is total facility power, not IT load. Dedicated on-site generation is intended to accelerate first power without waiting for a major new grid connection. Target: 12 months from final investment decision (FID), proposed N+2 generation redundancy and 24/7/365 availability design objective. Expansion targets: 100 MW and 400 MW. Agree net IT load, PUE, rack density, cooling and ready-for-service schedule with the development partner.
Over here, 1,580 hectares is what we call the front paddock. About 3,900 acres, or a decent stroll before lunch.
02

Initial
Firm facility power target
25 MW
Indicative electricity price
US$170/MWh (A$250/MWh)
Expansion
Firm facility power target
100 MW
Indicative electricity price
US$100/MWh (A$150/MWh)
Large-scale campus
Firm facility power target
400 MW
Indicative electricity price
US$70/MWh (A$100/MWh)
All capacities, prices and timeframes are indicative targets, subject to engineering, approvals, financing and definitive agreements. US$ figures use an illustrative AUD/USD rate of 0.663.
Target 60% reduction in AUD power pricing and 16-fold capacity expansion. Negotiate capacity reservations and contractual pricing step-downs. Initial hybrid/off-grid supply bridges later renewable generation, storage and grid integration. PPA term, indexation, included charges and renewable share remain to be established.
03

Approved energy development: 70 MW solar PV and 140 MW / 280 MWh battery storage. Potential solar expansion to 300 MW, with approximately 2 GW total precinct solar potential, distinct from firm data center capacity.
Adjacent 275 kV and 33 kV infrastructure; reported indicative line capacity 100+ MW and 2+ MW respectively, subject to connection. Potential Northern Transmission Project integration.
On-site and adjacent triple fiber infrastructure: ElectraNet OPGW east and transcontinental fiber west. Indicative services up to 400 Gbps to supported endpoints; optical potential above 50 Tbps per fiber pair. Carriers, latency and physically independent routes require confirmation.
Adjacent water pipeline stated at 6 kL/hour (about 1,585 US gallons/hour); potential Northern Water Project access. Allocation and entitlement remain to be established.
04
Design and jointly develop the initial campus; propose scalable, high-density liquid-cooled modular architecture, factory output, lead times, Australian code compliance, power integration, commissioning and maintenance. Bring customer relationships and consider equity, equipment leasing or vendor finance. Offshore fabrication, local assembly and Australian manufacturing are all welcome. No proprietary architecture mandated.
Illustrative facility modules: 10 × 2.5 MW, 5 × 5 MW or 2 × 12.5 MW at 25 MW; 160, 80 or 32 at 400 MW respectively. No order commitment.
Bring your modules over. We’ll put the kettle on and the power on, roughly in that order.
05
complete modules, data halls, power, thermal management, controls and integrated compute; potential repeat supply and an Australian reference site.
powered land, powered shells, turnkey facilities and dedicated power; new-build renewable PPAs for off-site Australian NEM portfolios subject to grid access and settlement, not physical firm delivery to remote sites.
development JV or project equity; ownership of land-related interests, shared infrastructure, energy or data center assets; separate compute ownership possible. Financial returns and terms to be negotiated.
06
SiliconAurora has an agreed compensation agreement with the local Traditional Owners, the Barngarla Determination Aboriginal Corporation.
Visit barngarla.org.auSiliconAurora also has a compensation agreement with the pastoral farming family who have farmed sheep on the property for generations.
SiliconAurora proposes a community benefit program through the Spencer Gulf Power & Data Co-operative (SG Power), seeking lower local electricity bills and greater energy resilience for communities around the precinct.
SG Power is a concept-stage initiative in South Australia proposing that communities near major renewable energy and AI data center projects share directly in their benefits. It is not yet incorporated and is not an authorized electricity retailer.
Competitive offers and recurring bill credits, funded partly by participating developers.
For customers living closest to participating projects.
Exploring backup power, batteries and microgrids for essential services.
SG Power is at concept stage and is inviting public comment. Its proposals are not confirmed commitments by SG Power, its founders or any developer, and SiliconAurora’s participation remains a proposal.
Visit spencergulfpower.com.au07
Share company, country, corporate email, partner type, capacity, deployment date, factory capability, financing interest and technical requirements. Request a confidential management discussion.
Drop Shane a line. He’s friendly, he answers his email, and he’ll only mention the weather twice.
Contact us